JavaScript is needed for the interactive quiz. You can still read each practice question, answer and explanation below.
1. A project needs panels cut to size. Which proposal removes the cutting hazard from the site rather than controlling exposure to it?
Order the panels pre-cut to the required dimensions
Ordering the required sizes removes this cutting operation from the site. Extraction or an enclosure can reduce exposure, but the hazardous operation still takes place. Assess the remaining installation risks separately.
2. A commercial project will involve several contractors. Under CDM, who must prepare its construction phase plan before that phase starts?
The principal contractor
The principal contractor prepares the construction phase plan on a project involving more than one contractor. The principal designer coordinates the pre-construction phase; the similar titles do not make those duties interchangeable.
3. An operator has a current training certificate but has not used the proposed machine attachment before. What should the manager establish before assigning the work?
Confirm competence with this equipment and task, including the attachment
Check the knowledge, skills, experience and training needed for the actual equipment and work. A current certificate is relevant evidence, but does not by itself establish competence with an unfamiliar attachment.
4. A programme change puts two contractors in the same work area at the same time. Each has a method statement, but neither considers the other trade. What should the principal contractor do before that work starts?
Coordinate the work, revise the plan and brief both trades
The principal contractor coordinates the construction phase, including risks created by contractors working together. Separate method statements do not resolve a conflict between activities. Agreed arrangements must be reflected in the plan and put into practice.
5. Work at height cannot be avoided. Suitable guardrails and a suitable personal fall-protection system are both possible. Which principle should guide the choice?
Consider collective protection before a personal system
Guardrails are collective protection: they protect people without each person having to connect a system. Training and convenience matter, but do not reverse the priority given to collective measures.
6. A worker will use a low platform beside an opening where a fall could cause injury. How should the manager treat the task?
Assess and control it as work at height
A fall need not be from two metres to cause injury. A low platform or an opening can create a work-at-height risk. Classification depends on the possible fall, not whether a harness has already been selected.
7. A pedestrian walkway must cross a vehicle route. Which layout best manages that crossing?
Provide a signed, well-lit crossing with clear sight lines
Where routes cross, drivers and pedestrians need to see one another clearly, with appropriate signs and lighting. Low speed or a nearby marshal does not remove the problem of a poorly positioned crossing.
8. Vehicles reverse repeatedly through a busy delivery area. Which proposal should the manager examine first to reduce the risk at its source?
Consider a one-way layout or turning area to reduce reversing
First consider whether the layout can remove or reduce reversing, for example with a one-way route or turning area. Signallers, visibility aids and scheduling may help control movements that remain; they do not remove the need to reverse.
9. Workers repeatedly carry heavy components between workstations. Before improving lifting technique or rotating staff, what should the manager consider?
Consider changing the process or using equipment to avoid the lift
Avoid hazardous manual handling where reasonably practicable, such as by changing the process or using suitable handling equipment. Training and rotation may have a role, but should not replace considering how to avoid the operation.
10. An assessment covers lifting a 20 kg component at waist height. The same component must now be lifted from the floor while reaching around an obstruction. What is the appropriate conclusion?
Reassess the changed posture, reach and other handling risks
Weight is one part of the risk. Reach, posture, the individual and the working conditions also matter. An assessment of a waist-height lift does not automatically cover a different handling task, and there is no universal legal safe-weight limit.
11. An occupied building has an asbestos management survey. Planned refurbishment will open wall voids outside that survey’s scope. What further survey information is needed before disturbing them?
A refurbishment or demolition survey of the affected areas
Intrusive refurbishment needs survey information covering the parts that will be disturbed, including hidden materials. An up-to-date management survey or register is useful, but cannot fill a gap outside its scope.
12. Workers uncover material they suspect contains asbestos. Its identity is unconfirmed. What is the appropriate immediate management response?
Stop disturbance, restrict access and arrange competent assessment
Prevent further disturbance and keep people away while the material and required precautions are assessed. Awareness training is not permission to sample or remove suspected asbestos; cleaning it up can itself release fibres.
13. A contractor says dust controls can be reduced because the team has no symptoms. Which response best reflects how construction-dust risks should be assessed?
Assess exposure; illness may develop before symptoms appear
Some dust-related diseases take time to develop, so feeling well does not establish safe exposure. Assess the material, task and controls. Visible dust can warn of a problem, but its absence is not proof that the air is safe.
14. A sanding task produces hazardous dust. Which proposed measure captures the contaminant close to where it is generated?
Use suitable local exhaust ventilation at the sanding process
Local exhaust ventilation captures contamination near its source. General ventilation dilutes it after release, and respirators protect the wearer rather than capturing it. The assessment may require more than one control.
15. A manager is procuring equipment for a noisy operation. Which decision addresses the noise source rather than relying on personal protection or reduced exposure time?
Select suitable quieter equipment or a quieter process
Quieter equipment or a quieter process reduces noise at source. Rotation and scheduling can reduce exposure, while hearing protection may still be needed. They are not reasons to overlook a suitable quieter alternative.
16. A worker alternates between a breaker and a sander. Reliable vibration levels are available for both. Which additional record is needed to assess the worker’s daily exposure?
Each tool’s actual exposure time, matched to its vibration level
Use vibration levels and actual exposure time for each source. Time allocated to a job can include breaks and other activities; recording just the longest-used tool misses exposure from the other one.
17. A subcontractor submits a chemical safety data sheet as its complete COSHH assessment. What further work is needed?
Assess how it will be used and who may be exposed
The sheet supplies hazard and precaution information; it does not assess the actual task. Consider the use, exposure and people affected to select controls. Copying the PPE section alone misses that assessment.
18. An inspection finds that workers regularly bypass a planned control because it obstructs the task. The assessment was signed last week. What should the manager do?
Review why it is bypassed with users and implement suitable controls
A recent document does not prove a control is effective. Find out why it is bypassed, review the task with the people doing it and implement suitable arrangements. Repeated signatures alone do not resolve an impractical control.
19. Heavy rain may have affected an excavation overnight. Yesterday’s inspection found it safe. What is needed before workers enter this morning?
Obtain a competent inspection and remedy any safety defects
An event that may affect stability calls for another competent inspection, as well as the normal shift inspection. Yesterday’s report cannot confirm conditions after the rain. Address defects before allowing work in the excavation.
20. A routine lift is changed to an unusual load beside a new obstruction. What should the manager establish before authorising it?
Have competent people review the plan and supervision for the changed lift
The plan must address the actual load, surroundings and foreseeable risks, with supervision proportionate to the operation. Capacity and certificates are important, but do not cover a newly introduced obstruction or make an old plan suitable.
21. A manager proposes dropping daily lifting-equipment checks because a recent thorough examination found no defects. What is the main flaw in that proposal?
Damage can develop between examinations
A thorough examination assesses equipment at that time; damage or deterioration may arise afterwards. Suitable checks and maintenance are still needed. A clean report does not replace them or transfer the user’s responsibilities.
22. A tank-cleaning job would involve confined-space entry. Which issue should the manager resolve before planning entry precautions?
Whether the cleaning can be done from outside
First consider whether entry can be avoided. Rescue equipment and communication are important when entry is necessary, but should not displace the option of doing the task safely from outside.
23. The permanent welfare block will open three days after construction starts. Which planning decision meets the need for welfare in the meantime?
Arrange suitable welfare for the initial period as well as later work
Welfare must be available from the start and throughout the work. Temporary or properly arranged shared facilities may be suitable; an informal expectation that workers will find their own does not establish adequate provision.
24. A work-related death is reportable under RIDDOR. When must the responsible person first notify the enforcing authority?
Without delay
Immediate notification and the later report are different requirements. Notify without delay; the required report must be received within ten days. Do not wait for the internal investigation before notifying.
25. Plant will operate near overhead power lines. Which statement should guide the precautions?
Electricity can flash across a gap before contact occurs
Electricity can flash over when plant gets too close, even without contact. Plan with the line owner and establish suitable precautions. Visual judgement, a marshal or rubber tyres do not by themselves make the operation safe.